Commercial critical-load distribution in Sacramento

A defined set of commercial loads that stay on — a can, a feeder, and a transfer method, not a hope at the main.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. The subset
  2. Sizing the subset
  3. When it is a different job

Critical-load distribution: a designed subset that stays on — not the whole building, and not legally required emergency

Critical-load distribution is a designed subset: the circuits that have to survive an outage, fed from a transfer method that actually includes them. It is optional standby, not a hope at the main, and it is not the whole building on the generator.

Critical-load distribution: the subset is sized to the generator and prioritized — not a wish list the generator cannot carry

A critical-load design is a calculation, not a checklist: the circuits that must survive are moved to a can the transfer method feeds, sized so the generator actually carries them, with a shed order if it cannot carry them all at once.

  • Sized to the source

    The subset load, its inrush, and the generator rating have to agree. A subset that starts everything at once can stall a set that could have carried it sequentially.

  • A shed or priority scheme

    When the wish list exceeds the source, load shedding or priority control decides what drops first — designed in, not discovered during the outage.

  • Fed from the transfer

    The can is fed downstream of the switch that actually includes it. A critical-load can wired ahead of the transfer stays dark exactly when it matters.

When critical-load distribution isn’t the right job

A designed optional subset is this job. Legally required emergency, or the generator connection, are not.

The occupancy named legally required emergency

That is emergency-power distribution.

Only the transfer switch is the problem

That is an automatic transfer switch.

Critical-load distribution questions

Can we put the whole building on the generator?

Not as a default. This job is a defined subset. Putting everything on is a different calculation, and it is still not legally required emergency.

The inspector asked for emergency power.

That is emergency-power distribution. Mixing optional standby with the legal set in one can is how inspections fail.

Is this a house critical-load panel?

No. This is commercial distribution: a can, a feeder, and a transfer method that actually includes the circuits. A house panel is a different product and a different page.

The ATS does not feed the can we care about.

Then the transfer method is the problem — an automatic transfer switch that sits upstream of this subset.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical