Before the paver sets a date, walk the route with us from the house to the proposed garage panel. That’s the path of the feeder, the wiring that supplies the garage. Empty conduit under the driveway can save digging later if we can reach both ends and pull the planned wiring through it.

What equipment or appliances do you want to run in the garage?

Show us where you expect to use power. A garage light and door opener draw much less power than a shop where several heavy tools run together. A garage subpanel can distribute power to those circuits. We still need to check how much load your house can supply and choose the feeder for the uses you have in mind.

Who handles locating buried lines and putting the yard back after digging?

Before the trench is opened, the excavation contractor arranges the utility markings. Point out any sprinkler controls, electric gate or lights between the house and garage. Their buried lines may belong to you and may be missing from the utility markings. We’ll walk the proposed crossing with the excavator so private lines can be located before the crew settles on the digging route.

We’d identify the conduit and electrical work in our price and go over excavation, backfill and surface repair with the paving contractor. We’d confirm inspection clearance with the inspector before giving the paver the go-ahead to cover the crossing.

Can you prepare the crossing now and add the garage equipment later?

Often, yes. Once we know what the garage will need, we can specify the conduit, the route and where to leave each end accessible. We can then coordinate with the paver around the required inspection. Keep the drawing and photos that show the ends in relation to fixed points on your property.

If your shop plans are still changing, tell us which tools you might add later. We can show you what would have to be dug up again if you wait. Shifting the path into an accessible planting strip may be a better investment than installing conduit for equipment you haven’t chosen.