A replacement rooftop unit can fit the raised support on the roof and still need electrical work before it can run. If the crane is booked and we first see the replacement model on delivery day, the unit may be sitting on the roof while you wait for a new circuit. Send us the HVAC supplier’s model sheet before you book the lift.
Voltage, phase and circuit ratings for the replacement rooftop unit
On the model sheet we look for voltage and phase to see what kind of power the unit needs. Minimum circuit ampacity (MCA) tells us how much current the supply wiring must carry. Maximum overcurrent protection (MOCP) tells us the largest fuse or breaker the unit allows.
Checking the existing wiring and disconnect before crane day
During a commercial HVAC electrical assessment, we compare the specifications with the actual wiring, breaker or fuses, and the shutoff switch at the unit. An old breaker with a matching number doesn’t establish that the wiring and shutoff are suitable. Ask the building manager to arrange roof and electrical-room access on the same visit.
What should the mechanical and electrical quotes cover?
Our quote would spell out the electrical disconnection, any new switch or wiring, and the final power connection we’re pricing. We’d compare that with the HVAC contractor’s scope before the crane arrives, especially who handles the controls and who starts the unit.