A panel move is easiest to price while the doorway or cabinet beside it is still a line on a drawing. Show us the proposed layout. We’ll trace where the existing circuits enter the panel and mark possible new locations with your builder. Moving it a few feet along an open wall can involve much less work than moving it across a finished hallway.
Does the meter have to move too?
We start by identifying whether the panel you want to move is separate from the meter and main shutoff. A panel inside the house can be supplied from a meter and disconnect outside. In that layout, we can often leave the meter where it is and reroute the wiring that feeds the indoor panel. With a combined meter and panel on the wall being altered, moving the enclosure also moves the meter. We’d coordinate the proposed position and disconnect with the utility before your builder commits to the layout.
Your service address matters here. For instance, SMUD’s underground-service requirements tie possible reuse of existing service wires to whether they can reconnect at the proposed meter position. That’s a reason to check the location before the builder frames around it.
What makes one new location for the panel easier than another?
We check how much working space will remain in front of the panel after the remodel is finished. Show the cabinet depth, how the door swings and where the shelves will go. An empty wall on the drawings can become a very different space once everything is installed.
We trace the existing circuits to see which will reach the new location and which would need extensions. If accessible junction boxes are part of the proposal, have the builder mark them on the finish plan. That keeps a cabinet or sheet of drywall from covering a box that must remain accessible.
Pricing the panel move and wall repairs before framing
We can price the panel move while your builder can still adjust the doorway. We’d identify the walls we’d need to open and whether the move involves the meter, so the builder can allow for finish repairs. If you’re adding major appliances, we can separate any work they need from the cost of moving the panel with an electrical capacity assessment.