A trench can account for a big difference between two panel upgrade estimates. If we can use the conduit already buried between the utility supply and your meter, we can price the upgrade without digging a new trench. If the utility requires a new route, or the new wires won’t pass through the existing conduit, we need to price the underground work too.
Can we use the conduit that’s already there?
Sometimes. For a home served by SMUD, the existing underground conduit may be reusable if the new wires fit and the route meets the utility’s residential service requirements. Even if the route qualifies on paper, a blockage or damage can keep the new wires from being pulled through.
We start with the utility that serves your address. If that’s Roseville Electric or PG&E, we use its requirements when we put together your estimate. The utility name on your electric bill helps us check the right one.
How conduit reuse and new trenching change the service upgrade estimate
If we can reuse the conduit, our price for the service upgrade would cover the panel and the electrical work we’re quoting at the meter. We’d list the meter work, say who would pull any new wires through the existing conduit, and show whether that work is included in our price.
If a new trench is needed, we’d show you where it would run and separate the cost of the underground work from the panel work. Say the route crosses your driveway. We’d spell out who cuts the concrete, who digs and fills the trench, and who puts the driveway back. If you’d need to hire a paving contractor separately, we’d identify that, so you can get a paving price before deciding.
How we quote trenching while utility approval is pending
We’d show the price that assumes reuse and identify any trenching figure as a separate price or an allowance. If the route is still unknown and we can’t price it yet, we’d say so. If we later find that the conduit can’t be used, we’d explain what changed and what the new work would cost so you can decide whether to authorize it.