Commercial machinery circuits in Sacramento

Power to the machine on the floor — feed, disconnect, and a path that does not cross a forklift aisle unprotected.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. The floor
  2. The machine panel
  3. When it is a different job

Machinery circuits: the last twenty feet: feed, disconnect, and a path that is not an extension cord

Machinery circuits are the last twenty feet: the feed, the disconnect, and how the whip or the bus drop reaches the machine. Moving a machine without redoing that path is how shops live with extension cords.

Machinery circuits: you feed the machine’s disconnect — the control panel inside is the builder’s world

Industrial machinery arrives with its own control panel built to NFPA 79. Your job is a supply that lands cleanly at the machine’s disconnect, rated for what the panel says it needs — not rewiring the guts of the machine.

  • Rated to the machine, not a guess

    The machine nameplate gives full-load current and a short-circuit current rating the supply has to respect. Landing an oversized feed on a panel with a low SCCR is a hazard label waiting to happen.

  • The supply, the disconnect, the whip

    A feed to the machine’s disconnect, a whip or bus drop that reaches it, and a path that does not become an extension cord the next time the machine moves.

  • Not the internal controls

    The PLC, the drives, and the safety circuits inside are the machine builder’s. We deliver clean, correctly sized power to the door.

When machinery circuits aren’t the right job

The path to the machine is this job. A warehouse tenant on the slab, or the three-phase landing, are not.

The tenant is a warehouse and the slab is the job

That is warehouse electrical.

The machine is three-phase and the landing is the job

That is three-phase equipment connections.

Machinery circuits questions

The cord has been there for years.

A temporary cord that became permanent is this job. The last twenty feet — whip, bus drop, or a real feed — is the work, not another cord.

We are taking the whole warehouse down to the slab.

That is warehouse electrical. This job is power to the machine on the floor.

The new machine is three-phase.

The path still has to reach it without crossing a forklift aisle unprotected. The landing is three-phase equipment connections.

There is no spare breaker.

Then the machine still needs a home. A dedicated circuit, or a can with spaces, is dedicated equipment circuits.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical