Commercial load management: building-wide shedding and sharing — HVAC, process, and charging, not EV-only
Commercial load management is the building-wide version of not buying a service upgrade yet: shedding, sharing, or sequencing large loads. Charging is one case. HVAC and process loads are others. The existing service is the constraint.
Only the chargers have to share
A row of stalls on one feeder is commercial EV load management.
The service is actually short
After the calculation, that is commercial service upgrade.
The rooftop units are the large load
Feeds and disconnects for the equipment are HVAC equipment feeds.
Commercial load management: the point is usually the demand charge, not just avoiding an upgrade
Building-wide load management earns its keep two ways: it can let new load fit an existing service, and it can shave the peak that sets a commercial demand charge. Sequencing HVAC, process, and charging is as much a utility-bill decision as a capacity one.
-
Peak shaving
Commercial bills often price the highest fifteen-minute demand of the month. Staggering large loads so they never all peak together can cut that charge without cutting the work done.
-
Sequencing the big loads
HVAC compressors, process equipment, and chargers are prioritized and staged so the building rides under a set ceiling — a control scheme, not a bigger service.
-
Measured and monitored
The system reads real demand and proves the ceiling holds. A load-management claim with no metering behind it is guesswork, not a design.
When commercial load management isn’t the right job
Sequencing the building’s large loads is this job. Chargers sharing a service, or a proven service increase, are not.
Only EV chargers have to share a feeder
That is commercial EV load management.
The calculation already says the service is short
That is commercial service upgrade.
Commercial load management questions
We only have a charger problem.
Then start at commercial EV load management. This job is building-wide — HVAC, process, and charging sequenced together.
Can this avoid a service upgrade?
When the loads do not have to peak together, yes. When the calculation is already short, that is commercial service upgrade — not a default, and not this job pretending.
The HVAC is the spike.
Shedding or sequencing it is this job. The feed and the disconnect at the unit are HVAC equipment feeds.
Is this a residential load-management gadget?
No. This is commercial, building-wide. A house device copied onto a garage is how people buy the same peak twice.
What is a load management system?
Controls that shed or stagger large loads so the service stays inside its rating.
Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.
Serving 19 communities across the Sacramento area
Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.
Get estimate
Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.
- 01
You send the problem or the plan, with the address if you have it.
- 02
We reply with what it involves and what has to be seen in person.
- 03
Nothing is scheduled, and nothing is priced, until the equipment has been looked at.