Commercial load management in Sacramento

Commercial load management for a building that is close — shedding or sharing so the service can stay.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. The building
  2. Demand charges
  3. When it is a different job

Commercial load management: building-wide shedding and sharing — HVAC, process, and charging, not EV-only

Commercial load management is the building-wide version of not buying a service upgrade yet: shedding, sharing, or sequencing large loads. Charging is one case. HVAC and process loads are others. The existing service is the constraint.

Commercial load management: the point is usually the demand charge, not just avoiding an upgrade

Building-wide load management earns its keep two ways: it can let new load fit an existing service, and it can shave the peak that sets a commercial demand charge. Sequencing HVAC, process, and charging is as much a utility-bill decision as a capacity one.

  • Peak shaving

    Commercial bills often price the highest fifteen-minute demand of the month. Staggering large loads so they never all peak together can cut that charge without cutting the work done.

  • Sequencing the big loads

    HVAC compressors, process equipment, and chargers are prioritized and staged so the building rides under a set ceiling — a control scheme, not a bigger service.

  • Measured and monitored

    The system reads real demand and proves the ceiling holds. A load-management claim with no metering behind it is guesswork, not a design.

When commercial load management isn’t the right job

Sequencing the building’s large loads is this job. Chargers sharing a service, or a proven service increase, are not.

Only EV chargers have to share a feeder

That is commercial EV load management.

The calculation already says the service is short

That is commercial service upgrade.

Commercial load management questions

We only have a charger problem.

Then start at commercial EV load management. This job is building-wide — HVAC, process, and charging sequenced together.

Can this avoid a service upgrade?

When the loads do not have to peak together, yes. When the calculation is already short, that is commercial service upgrade — not a default, and not this job pretending.

The HVAC is the spike.

Shedding or sequencing it is this job. The feed and the disconnect at the unit are HVAC equipment feeds.

Is this a residential load-management gadget?

No. This is commercial, building-wide. A house device copied onto a garage is how people buy the same peak twice.

What is a load management system?

Controls that shed or stagger large loads so the service stays inside its rating.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical