Commercial multifamily EV charging in Sacramento

Multifamily charging that respects meters, house load, and the stalls people will actually use.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. Meters
  2. EV-ready & billing
  3. When it is a different job

Multifamily EV charging: house load or assigned meters — those are different designs, and the stalls people will actually use

Multifamily EV charging sits on house load or on assigned meters, and those are different designs. Load management, billing, and the existing service decide whether the job is a few assigned stalls or a networked garage.

Multifamily EV charging: california expects EV-ready spaces — and every stall needs an owner on the bill

New and renovated multifamily in California carries EV-ready and EV-capable requirements under the building code, and every stall that charges has to land on someone’s bill. The design is a metering and cost question as much as a circuit one.

  • EV-ready by code

    CALGreen and Title 24 set how many spaces must be EV-ready or EV-capable in qualifying multifamily. Meeting it at construction is a fraction of the cost of retrofitting a finished garage.

  • House meter or submeter

    Charging on the house meter socializes the cost across every tenant; a submeter per stall attributes it. Which one the property wants changes the whole electrical layout.

  • An old garage retrofit

    Adding stalls to an existing structure is a panel, a feeder, and often load management before a single charger hangs — the concrete and the conduit are the hard part.

When multifamily EV charging isn’t the right job

Tenant or assigned stalls on a residential property are this job. Employee stalls on a commercial service are not.

It is employee or fleet charging at a workplace

That is workplace EV charging.

You only need to measure the stall

That is submetering.

Multifamily EV charging questions

Can we put it all on house load?

Sometimes. House load that cannot take unmanaged charging is why load management and assigned meters exist. Sharing the feeder is commercial EV load management.

How do we bill the stall?

That is submetering. This job is the stalls, the meters, and the service they sit on.

The board wants twenty stalls next year.

Then the existing service may be the limit. A building increase is multifamily service upgrade — not a stack of house chargers.

Is this the same as workplace charging?

No. Tenants, house meters, and assigned stalls are this job. A workplace lot is workplace EV charging.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical