Commercial workplace EV charging in Sacramento

Workplace chargers on a commercial service — the load question first, then the circuits, then the stalls.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. The load
  2. The stalls
  3. When it is a different job

Workplace EV charging: a load problem before it is a charger problem — then the circuits, then the stalls

Workplace EV charging is a load problem before it is a charger problem. A row of stalls on a service that cannot carry them is a failed install. Load management, a dedicated feeder, or a service increase are the real forks.

Workplace EV charging: networked for reimbursement, accessible where code says, and wired for the next row

A workplace lot is more than circuits to a charger. Whether the stalls are networked for access and cost recovery, whether an accessible stall is required, and how much conduit is set for the next phase all decide the install today.

  • Networked or dumb

    OCPP-networked chargers allow access control, usage reporting, and cost recovery; unmanaged units are cheaper and simpler. Which one fits is a policy question that changes the wiring and the data path.

  • Accessible stalls

    Once EV stalls exist, a share of them and their route can trigger accessibility requirements. Catching that at layout is far cheaper than restriping later.

  • Conduit for phase two

    A lot rarely stops at its first chargers. Setting spare conduit and panel space now is the difference between adding stalls and trenching the lot twice.

When workplace EV charging isn’t the right job

Employee or fleet stalls on a commercial service are this job. Assigned residential-property stalls, or chargers sharing a close service, are not.

The stalls can share and the service can stay

That is commercial EV load management.

It is apartments, not a workplace

That is multifamily EV charging.

Workplace EV charging questions

Can we just hang a row of Level 2s?

Not before the load question. A row of chargers on a service that cannot carry them is a failed install. Sharing that feeder is commercial EV load management.

The panel is already busy.

Then the forks are load management, a feeder, or commercial service upgrade after the calculation — not a default to more amps.

Employees want their own meters.

Billing a stall is submetering. This job is the workplace load and the stalls.

Is this the same as a home charger?

No. A house is a different design. This job is a lot or a garage on a commercial service.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical