Commercial electrical testing and commissioning in Sacramento

Acceptance testing and commissioning before a new electrical system is handed over — equipment checks and the system sequence the owner specified.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. Which tests
  2. System vs meter
  3. The records

Electrical testing and commissioning: which tests does the project call for?

Before you accept a new electrical system, you may have two separate questions. Is each piece of equipment ready to turn on? When the equipment works together, does the building operate the way the owner specified? Litel Electric can review the electrical testing and commissioning scope for your Sacramento project before you schedule handover.

Send the electrical specifications, the drawing showing how the equipment connects, and any test forms the owner requires. Acceptance testing examines individual equipment before it enters service. If the contract requires an independent testing agency or a named witness, identify that requirement before assigning the work.

Electrical testing and commissioning: what does a system test show that a meter reading can’t?

Take a building with a generator and a transfer switch. A voltage reading at the switch can show that power is available. It can’t show that the intended loads transfer to backup power and return to their normal supply in the sequence the owner needs. Before testing, we’d walk through that sequence with your facilities team, identify who needs to be there and agree on which operations can be interrupted.

We review access and outage restrictions with the building contact before setting a test window. In an occupied building, a test that briefly interrupts a tenant’s equipment needs that tenant’s attention even if the electrical room is ready.

Test results and commissioning records for the building owner

We’d match each result to the equipment identifier on your drawing. For a failed check, we’d record what went wrong, what was corrected, and whether the equipment passed the repeat test. A dated record gives the next maintenance contractor a starting point if performance changes.

Send the commissioning requirements with the project address and intended turnover date. Include the equipment schedule and the name of the person authorized to accept the results.

Electrical testing and commissioning questions

Is commissioning the same as acceptance testing?

No. Acceptance testing checks each piece of equipment before it enters service; commissioning checks that the equipment works together in the sequence the owner specified. A project can call for one or both — the specifications say which.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.

Serving 19 communities across the Sacramento area

Litel Electric serves businesses throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical