On this page 3 sections
Can the main house supply the ADU?
A garage can have lights, a freezer and a perfectly good panel before you turn it into a second home. Add cooking, water heating, laundry and a heat pump, and the electrical question changes. For an accessory dwelling unit (ADU), Litel Electric looks at both the wiring inside the unit and how power will reach it. You can bring us a preliminary floor plan while those choices are still open.
We start with the equipment you plan to use in the unit. A kitchenette and a shared laundry room make a different appliance list from an electric range and a dryer inside the ADU. If both homes will share the existing electrical service, we calculate the demand from the ADU and the main house together. That calculation tells us whether the service can feed the ADU panel or needs an upgrade.
If separate utility billing matters to you, say so before settling on the equipment layout. We confirm the metering options with the electric utility serving your address. That decision can change where the equipment goes and where the wiring crosses the lot.
What changes between an attached conversion and a detached unit?
In a garage conversion, we trace the circuits serving the part of the building that will become living space. A light in the remaining garage may still share wiring with an outlet inside the planned unit. We account for that separation alongside the new kitchen and bathroom circuits.
For a detached ADU, bring the site plan as well as the floor plan. We look at the proposed route between buildings, where it crosses paving, and who will open and restore that route. Inside the City of Sacramento, the ADU application calls for existing and proposed utilities on the site plan. Mapping that route with your builder before pouring a walkway can spare you from cutting the new concrete.
What goes into the electrical estimate for your ADU?
Our estimate would separate the circuits inside the ADU, the wiring to its panel and any work at the house or meter. For a detached unit, we would spell out whether our price includes digging and restoring the route. If our load calculation shows the house needs a service upgrade, we would show you which planned loads put it over capacity and price that change separately.
When you contact us, include the project address, the layout and any appliances already selected. Our ADU electrical planning guide can help you assemble those details before a walkthrough.
ADU electrical installation questions
Do I need to choose every ADU appliance before you can quote?
No. A preliminary floor plan and the major equipment you are considering are enough to start the load calculation. We can answer the service question first and firm up the circuits as the appliance choices settle.
Will the ADU need its own panel?
Usually a subpanel in the unit, fed from the main service or a new one. Whether the existing service can feed it, or has to be upgraded, comes out of the load calculation for both homes together.
Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.Want the detail? ADU electrical
Serving 19 communities across the Sacramento area
Litel Electric serves homeowners throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.
Get estimate
Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.
- 01
You send the problem or the plan, with the address if you have it.
- 02
We reply with what it involves and what has to be seen in person.
- 03
Nothing is scheduled, and nothing is priced, until the equipment has been looked at.
- hi@litelelectric.com
- License
- CSLB #1115460 · C-10 electrical