Standby generator installation in Sacramento

A permanent standby generator sized to the circuits that matter — including a well pump’s starting load — with an automatic transfer switch.

Get an estimate

Tell us what you need. We reply with the next step — nothing is priced before it is seen.

Available 24 hours

Licensed C-10 · CSLB #1115460

Emergency electrical
3 sections
  1. What it starts
  2. Generator and fuel
  3. Transfer switch

What should the generator be able to start?

A permanent standby generator can bring the refrigerator, lights and other selected circuits back on after a brief startup delay, even when you’re away. A home on a private well has another priority: the generator needs to start the pump when the pressure tank runs low so water keeps flowing.

A pump motor can draw considerably more power for the moment it starts than it uses once water is flowing. During the site visit we identify the pump, the controls that start it, and the other equipment likely to be running at the same time. A generator sized for a refrigerator and lights can leave a house on a private well without water.

You may be happy to leave the electric oven off during an outage. If so, we can price a smaller set of backed-up circuits. If you want cooling as well, we include the outdoor unit and its indoor equipment in the calculation before quoting either setup.

Where can the generator and fuel supply go?

We check whether there is enough room for the generator where you want to put it. A spot beside the meter may shorten the electrical run but put the engine near a bedroom window. We check the manufacturer’s siting requirements, openings in the house, access for servicing and the route back to the transfer equipment before selecting a spot.

For a propane installation, we give the fuel supplier the generator model and the loads it will serve. A tank that handles the furnace and water heater on a cold morning must also deliver enough fuel when the generator starts. The supplier can check the tank, regulator and piping against that combined demand and estimate how long the available fuel will last. We’ll use that answer when comparing generator locations and sizes with you.

If you want one coordinated installation, we can work with your general contractor and fuel supplier on the base, fuel piping, electrical connection and finish repairs. Before you book, we’ll put the responsibilities and prices alongside each other so you can see who prepares the site, who connects the fuel and when we can commission the generator.

How the transfer switch starts and stops generator backup

An automatic transfer switch disconnects the backed-up circuits from utility power before supplying them from the generator. There is a brief interruption while the engine starts and the switch transfers. When utility power is stable again, the switch returns the circuits to their normal supply.

Before handover, we test what happens when utility power goes out and when it returns. We also check the equipment you selected while the generator is powering it. At handover, we can show you the list of backed-up circuits and how to recognize a fault alert.

Standby generator installation questions

Will a standby generator run the whole house?

It can, if it is sized for everything running at once — but most homes back up a chosen set of circuits instead. On a private well, we size for the pump’s starting load so water keeps flowing; cooling and ovens are added to the calculation only if you want them on.

Still not sure it is the right job? Call (279) 972-9272 — available 24 hours.Want the detail? Which circuits belong on backup

Serving 19 communities across the Sacramento area

Litel Electric serves homeowners throughout all 19 communities in our service area — from Davis and Woodland to Roseville, Folsom, and Elk Grove.

Get estimate

Tell us what is happening, or what you are planning. We read the details, tell you what else we need to know, and explain the next step before anything is scheduled.

  1. 01

    You send the problem or the plan, with the address if you have it.

  2. 02

    We reply with what it involves and what has to be seen in person.

  3. 03

    Nothing is scheduled, and nothing is priced, until the equipment has been looked at.

License
CSLB #1115460 · C-10 electrical